Renovated open-plan kitchen with handleless cream units, an oak island and an exposed steel beam across the ceiling

Renovations · North Devon

Full property renovations,period and listed cottages included,run by someone who understands old fabric.

Renovating a whole house, especially an old one, is a different job to building new: you are working with structure and materials that were never designed to a modern standard, often behind walls you cannot see into until you open them up. Adam Harrison has renovated an 18th-century cottage from the inside out and project-manages every renovation personally, so decisions about old fabric are made by someone who has already made them on his own house.

Established 2020 · £5m public liability · 12-month no-quibble guarantee · Period property experience

~20 years in the trade

Adam is a qualified bricklayer, Level 2 Trowel Occupations

C18th cottage experience

Full renovation of Adam's own period home

£5m public liability

Plus £10m employers' liability cover

One site, one boss

Adam project-manages every renovation personally

12-month guarantee

No-quibble workmanship cover after completion

Service overview

What a renovation with us actually involves

We take on full property refurbishments across North Devon: whole-house renovations, run-down properties bought to be brought back to life, and period and listed cottages that need careful, informed hands rather than a standard modern spec applied without thought. This is private client work only; we do not renovate for developers.

A full renovation typically touches every part of a house: structural repairs and alterations, replastering, rewiring and replumbing via certified specialists, new kitchens and bathrooms, flooring, joinery, insulation upgrades and decoration. We carry out the structural work, carpentry, plastering, tiling and general building ourselves, and coordinate Part-P electricians, gas-registered plumbing engineers and a structural engineer where the work legally requires their certification.

Older and period properties bring their own considerations that a standard renovation does not: solid walls that need to breathe rather than be sealed with modern vapour-tight materials, timber floors and roof structures that may have settled or suffered rot, and, on listed buildings, the need for listed building consent before certain work can even start. Adam has renovated his own 18th-century cottage from the inside out, so decisions about lime plaster versus gypsum, whether a beam is sound or needs sistering, and how to insulate a solid wall without trapping damp inside it, are made from direct experience rather than guesswork.

Renovation work is also more unpredictable than new build by nature. You cannot always know what a wall, floor or roof is hiding until it is opened up. We price a genuine contingency into every estimate, explain it clearly, and treat anything found once the job is underway as a proper conversation with you before it is priced and carried out, never a surprise on the final invoice.

Who it is for

Owners of tired, dated or run-down properties who want a full refurbishment rather than a room-by-room patch job, and owners of period or listed cottages who need the work done with an understanding of how old buildings actually behave.

When you need it

Before you move in if the property needs structural or services work done properly, or when a house has been neglected long enough that piecemeal repairs no longer make sense.

Why a professional renovation matters

Old buildings punish modern shortcuts. Sealing a solid wall with the wrong materials, or replacing a rotten timber without understanding why it rotted, both create bigger problems than the ones you started with.

What it costs to get wrong

What goes wrong when a renovation is badly run

Renovations, especially of older properties, generate more unwelcome surprises than almost any other kind of building work, and how those surprises are handled decides whether the project stays on budget or spirals.

Hidden structural problems found too late

Rot in a roof timber, a sagging floor joist, or a chimney breast with no proper support are common in older houses and are not always visible until walls or floors are opened up. Left unaddressed, or patched over cosmetically, they get worse and more expensive with every year.

The wrong materials on old fabric

Modern cement render, gypsum plaster and vapour-tight insulation on a solid stone or cob wall trap moisture that the wall was built to release. The result is damp that migrates, timber that rots, and finishes that fail within a couple of years.

Listed building consent skipped or ignored

Altering a listed building without consent (even internal work in some cases) is a legal matter, not just a planning technicality. It can mean enforcement action and having to reverse work already completed at your own cost.

The price that quietly doubles

Renovation estimates without a contingency look attractive on paper and fall apart the moment a wall is opened. We build a stated contingency into every estimate and explain what it covers before you commit.

No one owning the whole picture

A renovation touching structure, services, plastering and finishes needs one person sequencing all of it. Without that, trades clash, work gets covered up before it should be, and problems found by one trade never reach the person who needs to decide what to do about them.

Our process

Every stage planned, priced and signed off

You always know what happens next, who is on site, and what it costs before the work starts.

  1. 01

    Site visit and free estimate

    We walk the whole property with you, look at structure, services, condition and, where relevant, listed status, and give you a free, honest ballpark figure.

  2. 02

    Detailed quote and programme

    A full itemised quote is produced for a fee, refunded in full if you proceed. It sets out the sequence of work, contingency, staged payments and what is included.

  3. 03

    Strip-out and structural assessment

    Removing what needs to go, opening up areas of concern, and confirming with the structural engineer what is sound, what needs repair, and what needs replacing.

  4. 04

    Structural repairs and first fix

    Timber repairs, structural alterations, new openings where needed, first fix carpentry, and coordination of certified electricians and plumbing engineers.

  5. 05

    Plastering, second fix and finishes

    Plastering with materials appropriate to the wall, lime where the building needs it, followed by second fix joinery, kitchen and bathroom fit, tiling and flooring.

  6. 06

    Handover and guarantee

    We walk the finished house with you, clear any snagging, and hand over backed by our 12-month no-quibble workmanship guarantee.

What you get

The difference it makes on your property

Concrete outcomes, not promises: this is what changes when the job is run properly.

One person accountable

Adam quotes the job, runs the site and makes the calls on old fabric and unexpected finds personally, not a rotating cast of subcontractors.

Genuine period property experience

Having renovated his own 18th-century cottage, Adam has already made the decisions your house will throw up: breathable plasters, timber repair versus replacement, insulating solid walls without trapping damp.

Structural work done properly

Timber repairs, new openings and load-bearing alterations are assessed with a structural engineer and inspected by building control, not judged by eye and hoped for.

Fewer trades, less friction

Structural work, carpentry, plastering and tiling are done in-house by a team of five who work together every week, so the standard is consistent from strip-out to final coat.

Costs you can plan around

An estimate with a stated contingency, staged payments matched to the length of the job, and any genuine discovery explained and priced before it is carried out.

Protection after handover

A 12-month no-quibble workmanship guarantee means our responsibility does not end the moment the final invoice is paid.

In detail

Renovation detail: old fabric, structure and finishes

North Devon has no shortage of tired 20th-century houses and genuinely old cottages needing full renovation. The right approach depends entirely on what the building is made of and how it was built.

Assessing what you have got

Before any renovation starts, we assess the structure properly: roof timbers, floor joists, lintels, chimney breasts and, on older properties, the wall construction itself: solid stone, cob, brick or a mix built up over generations. That assessment, backed by the structural engineer where needed, decides what gets repaired, what gets replaced, and what can be left alone.

This matters because renovation decisions made without understanding the existing structure tend to cost twice: once to do the wrong thing, and again to undo it. Opening up early, rather than working around a problem, is what keeps a renovation on budget.

Period and listed cottages

Solid-walled period properties behave differently to modern cavity construction. They rely on being able to let moisture pass through the wall rather than being sealed against it, which is why lime plaster and lime render are often the right choice over modern gypsum and cement, a lesson learned first-hand renovating an 18th-century cottage rather than out of a textbook.

Listed buildings add a legal layer on top of the practical one: listed building consent is required for many types of alteration, sometimes including work that would be unremarkable in an unlisted house. We flag listed status at estimate stage and factor the consent process into the programme rather than treating it as an afterthought.

Structural timber and masonry repairs

Rot and insect damage in old timber does not always mean wholesale replacement. Sound sections can often be retained and repaired by sistering in new timber or resin repair where appropriate, keeping more of the original fabric and reducing cost, provided the underlying cause of the damp or leak has been fixed first.

Masonry repairs on old stone or cob walls use lime mortars matched to the original construction, not modern cement pointing, which traps moisture in the wall and accelerates the very decay it is meant to stop.

Insulation and energy performance in old buildings

Improving thermal performance in an old house is not simply a case of applying modern insulation methods designed for cavity walls. Internal or external wood-fibre insulation systems, breathable membranes and careful detailing at junctions let a solid wall keep working as it was built to, while still cutting heat loss meaningfully.

Floors, roofs and windows are assessed individually, sometimes secondary glazing and improved draught-proofing achieve more for a period property than replacing original windows outright, both for performance and for keeping the character of the house intact.

Whole-house sequencing

A full renovation moves through strip-out, structural repair, first fix services, plastering and second fix in a set order because each stage depends on the last being right, plastering before first fix is signed off means opening up finished walls later. We sequence the whole job rather than letting each trade work to its own convenience.

Where you are living in the property during the renovation, or moving in partway through, the sequence is planned around keeping essential rooms usable as long as possible and getting services reconnected in the right order.

Kitchens, bathrooms and finishes

New kitchens and bathrooms within a renovation are fitted as part of the same in-house sequence as the rest of the house, including tiling, so the finish is consistent with the rest of the work rather than handed to a separate fitter working to a different standard.

Flooring, joinery and decoration are the visible end of the job, but they only look right when the structure and services beneath them were done properly first, which is the whole reason the earlier stages get the attention they do.

Recent work

Photographs from jobs we have completed

Refurbished landing with a new balustrade, oak door and fresh carpet

Questions

Straight answers before you commit

If your question isn't here, call Adam on the number above and ask him directly.

Get an honest figure for your renovation before you commit

Tell us about the property, period or otherwise, and what state it is in. Adam will walk it with you and give you a free initial estimate, including the structural questions most quotes skip over.

Owner project-managed · £5m public liability · 12-month no-quibble workmanship guarantee

Call now Free estimate